Galter Pavilion Bridge Northwestern Memorial Hospital
An “out of the box” erection plan was called for on this new 9th-floor bridge connecting two campus buildings. A 30-ton crane was hoisted to the existing 8th floor and used to erect the
Copyrights © 2019 All Rights Reserved by CSG, LLC.